• <ul id="ysmgw"></ul>
    <ul id="ysmgw"><dfn id="ysmgw"></dfn></ul>
    <fieldset id="ysmgw"><table id="ysmgw"></table></fieldset>
      Homepage      Favorite      中文版
    Home About Us News info Products Services Recruitment Contact us
    NEWS CENTER
    Company News
    Trade News
    Exhibitions
    Videos
    CONTACT US
    Headquarter: No. 18, Yangguang Road, Xinyang Industrial Area, Haicang, Xiamen, P.R.China 361022
    Tel: +86-592-6539999
    E-mail: bussiness@xmzzj.com

    NEWS CENTER
    Location:Home → News Center
    Loader operating specification
    Public date:2017-7-26   Hits:6260

    Good operating habits to extend the life of your equipment doubled

    1, bucket transport height

    ★ illegal operation: with a high load arm walking loading, easy to cause the boom cylinder bending failure.

    ★ standard operation: the fighting state, the bottom of the bucket 40-50 cm off the ground, the slope to minimize.

    2, the operation, should make the loader straight on the front, before and after the frame should be in a straight line.

    3, prohibit the use of inertia high-speed plug into the pile, should rely on the driving force of the loader straight cut.

    4, the bucket cut into the angle is too large, all the load added to the front axle, resulting in the rear wheel vacant, prone to the front axle from the original screw teeth, axle or even the front axle support shaft fracture and other failures.

    5, prohibit the use of bucket corner digging hard materials, or prone to boom deformation, cylinder damage and other failures.

    6, the bucket inserted into the pile, you should first fight and then start the arm, or will cause the boom deformation.

    7, with a high load arm walking loading, easy to cause the boom cylinder bending failure.

    8, can not be carried out in the high digging operations or bucket bump material, so as not to arm arm cylinder bending.

    9, after discharge, should first stop or part of the resumption of operation and then move the arm, otherwise it will cause "pull the cylinder", damage dump tank.

    10, the bucket of the block by a long time due to deformation caused by deformation, wear, the timely repair welding to ensure that the bucket of the block in the normal bar, the discharge position to play an effective limit role.

    ★ If the limit block wear is not timely repair welding, will cause rocker deformation, fracture failure!

    11, wading operations, the water does not exceed the drive axle or gearbox output shaft seal the lowest parts.

    12, cabin, underground operating conditions, the engine to be installed tail gas treatment device.

    Previous  |  Next  |   Return to
    About Us
    Company profile
    Culture
    Organizational
    Development
    Subsidiaries
    Certificates
    Products
    Wheel Loader
    Block Handling Wheel Loader
    Excavator
    Other
    Spare Parts
    News
    Company News
    Trade News
    Exhibitions
    Videos
    Services
    Marketing
    After Services
    Question
    Downloads
    Recruitment
    Talent Concept
    Jobs
    Contact Us
    Feedback
    Contact us
    Copyright 2014- (C) Xiamen Loaders Co., Ltd. All Rights Reserved.
    Two-dimensional [Close]

    點擊這里給我發消息
    點擊這里給我發消息
    主站蜘蛛池模板: 国产精品电影在线| 国产精品久久久天天影视香蕉| 国产精品视频一区二区三区| 久久精品三级视频| 国产精品免费网站| 无码人妻精品一区二区三区久久久 | 久久99精品国产一区二区三区| 亚洲AⅤ永久无码精品AA| 国产乱子伦精品无码专区| 国产精品久久久福利| 日韩精品区一区二区三VR| 欧美人与性动交α欧美精品成人色XXXX视频| 久久亚洲精品视频| 99久久婷婷免费国产综合精品| 亚洲精品无码MV在线观看| 久热精品视频第一页| 国产乱人伦偷精品视频| 国产观看精品一区二区三区| 99精品国产一区二区三区| 精品无码av一区二区三区| 午夜精品久久久久久久久| 亚洲婷婷国产精品电影人久久| 久久国产热这里只有精品| 国产精品二区观看| 国产精品无码素人福利| 国产成人久久精品二区三区| 91精品国产综合久久香蕉 | 国产精品户外野外| 99久久免费只有精品国产| 88国产精品无码一区二区三区| 久久精品国产亚洲麻豆| 久久国产乱子精品免费女| 国产夫妇精品自在线| 国产99视频精品一区| 国产亚洲精品一品区99热| 九九在线精品视频专区| 久久99精品久久久久久| 99久久伊人精品综合观看| 国产99精品一区二区三区免费| 国产成人精品综合在线观看| 黑巨人与欧美精品一区|